Thursday 13 September 2012
Handing in day!!!
After thorough testing and de-bugging I have recently done, I re-checked my documents, and am satisfied it is ready to hand in, after finding the game works as expected, no glitches. I am pleased with my final product, and am glad the assessment is finished.
Tuesday 11 September 2012
Tuesday 4 September 2012
Game Progression
I've finished my game, and today I worked on problems, which I have now fixed... so overall quite a successful day, now I need to plan programming, and do some testing, before collaborating all the paperwork and handing it in on the 14th of September.
Monday 3 September 2012
Game
Today i finished making the game, without the problems the game is complete! So now I need to go back over everything, do a bit of testing, and fix my problems :/
Sunday 2 September 2012
Game
A few days ago I realized how little time I had left, and decided to down size my game, from having 7 levels to having 5 levels. I still need to test the program and finish the program planning, and I still need to actually finish programming the game... in less than 2 weeks...
Today I worked on my game once again.
Today I worked on my game once again.
Thursday 23 August 2012
Planning Programming
Today I forgot my USB stick and therefore did not have the updated version of my game, so instead I worked on the program planning which i had not modified since i copied it to the school's hard drive, as i have not finished it yet because i wasn't sure of what blocks/actions were available.
Also, we met our new IS teacher from EIT, Mr York, who will take out class for until Mr MacRaghnaill returns.
Also, we met our new IS teacher from EIT, Mr York, who will take out class for until Mr MacRaghnaill returns.
Game
Yesterday (13/08/2012) I forgot to blog and didn't leave time for it, so I am doing it now. I worked on my game, fixing a few problems and doing some more coding.
Monday 20 August 2012
Game
Today I worked on my game and added another problem to my 'problems occurred whilst programming'.
Game / Problems Occurred Whilst Programming
Yesterday I was so intent on the game, and I forgot to blog, so i am blogging now.
I decided to create a new document for problems that occur during the programming. I also worked on my program so more and made level 3.
I decided to create a new document for problems that occur during the programming. I also worked on my program so more and made level 3.
Tuesday 14 August 2012
Game
Again, once again, I worked on my game. Now I have made the second level and got the timer to work, and also I got the sprites in the first level to go back to their original spot if they were matched incorrectly :)
Monday 13 August 2012
Game
Today I did some more work on my game.... i know i should make a test plan and finish the program planning, but i find it difficult when i don't know what blocks i have available.... maybe i'll start on it later....
Sunday 12 August 2012
Thursday 9 August 2012
Wednesday 8 August 2012
BYOB work
Today in class I did some work on my BYOB game, just having a look, seeing what I can use/do, so maybe soon I can move back to the program planning, finish it and then test it. I know that is not quite correct, but i thought once i had a good idea of how i COULD program it i would revisit the planning part :)
Monday 6 August 2012
I started programming the game
I started programming the game.... and i think i may have an idea on how to change levels :)
Sunday 5 August 2012
Finished Planning....?
I think I sort of finished my planning, because I am not sure how to get the game to switch from one level to the next when all the pictures/words are correctly matched.... so I am making the sprites for now and I can think about how the levels change.
Thursday 2 August 2012
Flow chart :( / Templates :)
Because we had a short class time (reason: assembly) I didn't have much time (approx. 35mins) and so I had a look at flowchart symbols, and wondered whether I should make a flowchart for my game, for the program planning component. It would've taken a very long time so i decided not to.
I worked on my templates and cropped them to make them look nicer.
I worked on my templates and cropped them to make them look nicer.
Tuesday 31 July 2012
Program Planning
Today I did some more program planning, i think i am nearly finished, so tomorrow I will just check it over and maybe do a bit of testing.
Monday 30 July 2012
Algorithm/Program Planning
Today I worked again on program planning and I think what i need to do has become a lot clearer. Already I have finished some algorithms, and when I re-read them i noticed some errors, so I suppose my testing has already begun.
Hopefully I can finish planning the algorithms by the end of this week, and then I need to move onto the next task, according to my Gantt project planner. I think that is an achievable goal.
Hopefully I can finish planning the algorithms by the end of this week, and then I need to move onto the next task, according to my Gantt project planner. I think that is an achievable goal.
Sunday 29 July 2012
Program Planning
Today I started my program planning, and looked back over my Gantt project and the Brief. I think I am on track, and will be able to finish the program planning by the end of the week, then I can test it as much as someone can test a plan in Word.
Thursday 26 July 2012
Questions answered.... program planning commenced
As in the title, today I answered the questions Mr MacRaghnaill had saved on the student server, as I have a clearer idea of what my game is now. I started program planning, ie. writing down the program in Word. I will finish it tomorrow hopefully and then I can test it.
Tuesday 24 July 2012
Templates finished!
I have attached what I finished today, my templates for the game. The screen one the games should look similar to this ;) Now I can start to plan the programming, and then after testing it I can make the game!
Monday 23 July 2012
Storyboard continuation
Today I worked on my Storyboard again and started making templates for the different satges in the game (start, level 1, game over, you win etc.)
Sunday 22 July 2012
Finished gathering Sprites
Today I did some more on my Storyboard, I researched pictures to use for the sprites (baby animals). I have seven levels with 3 pictures/animals in each, so 21 pictures/animals altogether. It gets harder to find baby animals and nice pictures, and the baby names start to get repeated. So now I need to research colour themes etc , which i will do next class.
Thursday 19 July 2012
I changed the theme
I decided to change my theme from African Animals to Baby Animals, as there are not many African animals, but lots of baby animals, and I think children will enjoy learning the names for baby animals. I researched photos and saved the ones I liked and their URL.
Tuesday 17 July 2012
Start of Storyboard
Today I started my storyboard, choosing pictures so I can collaborate them together and make the final picture. My theme is African animals.
Monday 16 July 2012
Specifications
Today
I looked over my Gantt project again, and changed a few things, so I hadn’t
actually finished it yesterday. I also started on the ‘specifications’ as said
in my Gantt project. I have attached what I have so far, I think that will be
all.
Game:
· - Player starts with 10 points
· - One point gained from correct match
· - When points = 0, game ends
· - If the player takes longer than a specified time,
player loses a point
· - When word does not match picture, sound is made
and word moves back to original position
· - One point lost if word while being carried hits
a ‘danger’
· - 4 ‘dangers’ fall from the top of the screen
randomly
· - Asks for user’s name
· - Up to 30 words/pictures, 5 per round
· - Words/pictures sit on opposite sides of the
screen
· - Player must drag the words to the pictures
without being hit by the falling ‘dangers’
· - Works on expected and unexpected inputs
- 6 different levels
Sunday 15 July 2012
Completion of Gantt project
Today
I finished my Gantt project planning tool, and I have attached a screenshot. I didn’t
get any work done in the holidays as I was very very busy and had no time.
Thursday 28 June 2012
Completion of Inspiration
Finally finished Inspiration! I have attached the final copy :) I have now started on GANTT project and hope to finished it after 2/3 IS school slots.
Tuesday 26 June 2012
Inspiration
Monday 25 June 2012
Start of Inspiration
Today I decided to make a Gantt chart to plan this project. Then, I thought a much better idea would be to actually plan what I was going put in the Gantt chart, so I started a brainstorm in Inspiration 9. It is not finished as brainstorming seems to take a whole lot longer than I expected!
Sunday 24 June 2012
First Post
This is my first blog post... I am about to start on my Educational Game project, NCEA assessment 1.2, 1.45, 1.46.